Situation
L&T Hydrocarbon Engineering has offices in Mumbai, Baroda, Chennai & Hazira where they want to migrate on-premises workload on Microsoft Azure, aiming to leverage the cloud’s scalability, flexibility, and reliability while optimizing costs. By transitioning to the cloud, L&T Hydrocarbon Engineering anticipates enhanced efficiency in workload management across its various locations, enabling seamless operations and improved resource utilization.
Challenge
L&T Hydrocarbon Engineering has dedicated lease lines and sometimes due to latency and frequently disconnections they come across many issues, and that’s the reason it impacts their production environment. Resolving these challenges requires finding reliable connectivity solutions to ensure uninterrupted access to critical resources and data. Overcoming these connectivity hurdles is essential for maintaining operational continuity and optimizing productivity in L&T Hydrocarbon Engineering’s production processes.
Solution
Phase 1 – For Central India Connectivity setup and configure express route connectivity between Azure Central India Region and On-Premises locations through Mumbai POP.
Phase 2 – For South India Connectivity setup and configure express route connectivity between Azure South India Region and On-Premises locations through Chennai POP.
Phase 3 – Setup High Availability for Last Miles for Powai Location.
This comprehensive solution ensures reliable and efficient connectivity across different regions while enhancing availability for critical locations.
Country
India
Industry
Energy & Resources
Organization Size
1000+ employees
Solution Area
Infrastructure